Author: DEWL
-
-
3000m3 Pond
We completed this entire job up to the lining of the pond. For the winter months we incorporated a raised stand off pad to gravity feed into a sand trap, then pond, to keep the cows off the wet paddocks. Thanks AgFirst Engineering for the plans and technical advice!
-
Te Miro Woodlot
This job was a 3000 Tonne between 2 blocks. The first block was 26-year-old unpruned Pine
-